Workplan of the project

This project includes 23 work packages, which are grouped in 5 phases:
1) Translation and adaptation of the instruments and their training manuals

2) Assessors' training

3) Pilot study

4) Main study and

5) Dissemination of the results

FaLang translation system by Faboba