This project includes 23 work packages, which are grouped in 5 phases:
1) Translation and adaptation of the instruments and their training manuals
2) Assessors' training
3) Pilot study
4) Main study and
5) Dissemination of the results
This project includes 23 work packages, which are grouped in 5 phases:
1) Translation and adaptation of the instruments and their training manuals
2) Assessors' training
3) Pilot study
4) Main study and
5) Dissemination of the results